Timeline WIP

This entry was posted in Uncategorized and tagged , , . Bookmark the permalink.

One Response to Timeline WIP

  1. Natasha Sandmeier says:

    FAB. To make this an even more all-encompassing drawing, this should be 1m wide if printed at 1:500 so it also has within it half of the section – which would mean the diggers / trucks / excavators would be located at the correct grade level according to the stadium section at each time.